Kinda skipped out of the groove there for a bit. WE are now in a full-on push to get the other fuselage panel done and the whole thing on the HPT and folded into a basic airplane shape.
It takes two people about two hours to pre-cut the
fiberglass cloth (one ply each of UNI & BID), seal the foam with
slurry, and then position and wet out the cloth.
One picture shows the excess epoxy being squeezed out of the layup by the use of a vacuum bag.
Time Spent Today: 2.25 hr
No comments:
Post a Comment